“By the way, the electrical workmanship on conduit and cable trays in Ottawa building E-400 is exquisite. My complements to your electrical crew.”
Russell Brown, Vice President / Senior Project Manager
Haynes Electric Construction Company
“Thanks for hosting an informative & productive meeting. The Lectrus-SD operation is something to be proud of. Your hospitality is well appreciated.”
Bill Austin, Utility Designer
Sun Edison
“I wanted to personally thank you and the rest of the team at Lectrus for jumping all over this project for us, and making up time in your schedule even with the late delivery of the MV switchgear. With a 4/18 delivery of the MV switchgear, your team still agreed to keeping the 5/5 ship date, which is absolutely remarkable. This is the type of service that separates Lectrus from the rest of the IPA supply base. Thanks so much for helping us out!”
Steven B. Lovell, Product Manager – LVA / IPA / UST
Eaton Corporation
“I just walked thru the Lectrus building with the Siemens gear. It looks great. Can't remember any other building that we have received in the past few years that looked so good. The attention to detail is impressive. Please pass on to whoever was the Project Manager for Lectrus.”
Bill Herwehe
ConocoPhillips
“The Murphy Meraux SEB and the rest of the process unit was completely signed off, approved, and accepted by Murphy Oil this month. Thank you for all your work in getting the building finalized and for all those urgent phone calls from the field you helped us with this year. We couldn’t have done it without you.”
Ben Caldwell, Electrical Department Manager
Burns & McDonnell
“…the Lectrus folks in Chattanooga, TN were very hospitable to us and addressed the few punch list items we found very promptly (i.e., photocell wiring, a couple of wire tags, using a temp HVAC to check the circuit until the permanent unit was available then shipped separately, etc…). We had used them as “Metal Systems” several times for Entergy work in the past and for another bldg. along with EATON here at the Hunt Refining Co. in Tuscaloosa, AL prior to this one. Truthfully, we feel just as comfortable with their bldgs. as we do with the EATON/Cutler-Hammer Advantage MCC line ups… More importantly, the Gaylord Chemical owner of this unit is pleased so thanks to all for the good quality work.”
Brian J. Pertuit
Talson
“Thank you very much. This submittal package is about the best it could be. I, more than most, appreciate you dedication to a commitment (I do some late evenings also). You Sir, represent your company very well. Your attitude and commitment certainly helps put Lectrus in an elite group that is a pleasure to do business with. I look forward to us finishing this job together….Thanks again.”
Jerry Jones
Inline Electric
“Just a note of thanks for the great job on the new MCC building. Walking through it this week helped me realize the enormous amount of detail you have overseen on that building alone. Very sharp and professional installation. Can’t wait to see the control room building.”
Marc Smith
Gaylord Chemical
“Just a note to say thank you to you and all of your team for the exceptional effort you put in on our behalf. It really was a spectacular achievement, and given the pressure, your team was a delight to deal with.”
Chris Gough, Industrial Products Director - Medium Voltage Switchgear Products
Areva
"On behalf of Wade and myself, it was a pleasure coming out to your site for the inspection. The work was top notch and everyone we contacted seemed to take genuine pride in their work. I personally felt that I was part of the same team, and everone was there to 'get it right' for the final customer. Please pass on the 'good work done' to Craig, Adam, Denzil, and the many others, whos efforts went into the construction. Thank you very much for your services.
Victor Rodrigue Jr.
Advatech E&I Inspector
"I extend sincere thanks to you and your team for your time on Wednesday. I found the tour quite educational and our conversation over lunch was enlightening. Lectrus appears to be a very well run and professional organization. I look forward to working with Lectrus on future projects, and hope that I have a chance to converse with you in the future."
ControlTech Automation
"Ed Colbert has asked me to send you an email thanking you and your company for all of your work on the housing unit for a Cutler Hammer 38kV switch that was delivered to us today to the Easton Water Treatment Plant. I am told that it is a nice-looking unit and he is very happy with it. He also asked me to pass along his thanks to a Jeff from your company that was involved in the coordination of the delivery of the equipment."
The Chappy Corporation
"Thank you for your support of our projects. We all know and understand that there are problems along the road in any project - it is a matter of how you deal with them and overcome them. Thank you to you and your entire team for standing behind us."
ABB
“Overall ratings of 96 to 100 (out of 100) based on quality, delivery and administrative performance.”
Chrysler Corporation
Received the “Award for Excellent Performance,” only a total of 10 awards bestowed from over 5,000 suppliers.
Tennessee Valley Authority
“I want to make abundantly clear... that... THIS SALESMAN is in awe of the "miracle" that Lectrus (MSI) pulled off in getting this job ready to ship by the end of February. Particularly with our delays in getting our release on the job. Just wanted you to know that contractor was very pleased with Lectrus’ (MSI's) performance on the project. Great job! It makes doing business with Lectrus (MSI) a real pleasure! Thanks!"
Eaton Corporation
“The quality of your product exceeds our expectations. We measured quality, on-time shipping performance and purchase price change. Your overall delivery and quality scores were positive. Your total score was 100 (out of 100).”
Dock to Steam Team
Siemens Energy & Automation
“I want to personally thank you and your entire organization for the tremendous effort you gave... After years on this quality journey of ours, it's truly gratifying to see the kind of teamwork and bias for action you have exhibited this past year.”
Roger Milliken, Chairman and CEO
Milliken & Company
"Your company just did a cabinet for me (PO 103323). The quality was excellent! I have completed building my test stand with no headaches what so ever. Hopefully I am looking at doing at least three more so I know when that time comes you will be the vendor that I chose. I am glad that since my visit a year and a half ago that we have joined together as business partners. Keep up the good work and please let all of your workers that were involved know that Avtron is very pleased with what they are accomplishing there at Lectrus."
Charles S Gareis
Project Engineer / Aerospace Division
Avtron Manufacturing Inc.
"Lectrus (MSI) did an excellent job. The pre-fabricated building was completed ahead of schedule. Good craftsmanship. Satisfied Dow EMETL standards. Adjusted to several scope changes in a timely manner. Were flexible with the delivery date, agreeing to retain the building for an extra month. Lectrus (MSI) seems like a focused company and eager to please the customer. Monica Diaz did an excellent job as the Project Manager with Lectrus (MSI). She is one of the best that I have worked over the many years working with suppliers. I would recommend their services in the future.”
Simon Gonzalez-Paez
Supply Manager Global Purchasing
The Dow Chemical Company
“Thanks for all your support on these projects. The partnership relationship we have is the right model and is helping position GE were we want to be in the market. This will allow us to drive sales growth for both of us. Thanks again for Lectrus’ (MSI's) support your team is great to work with and we appreciate all the time they set aside for us.”
James Hinckley
GE Industrial
“Thank you ever so much for everything during our trip. Dominion & BSI were impressed with the personnel working on the building, the workmanship and every aspects of Lectrus (MSI)…. This was truly a great trip and Lectrus (MSI) did an excellent job!”
Sue McClosky, Project Manager
Eaton Corporation, Electrical Business
Commercial Construction & Industrial Projects Team
“I am writing to say thank you the excellent work and cooperation of Pat Combs and Richard Cummins on insuring that our project was designed correctly and stayed on schedule. Construction Technologies has supplied Thule Air Base in Greenland with over 31 equipment houses in the last 25 years. Thirty of these have been Lectrus’ (Metal Systems) houses. On the present project Thule Air Base engineering understood this history and placed this order for three houses direct with Lectrus. This long term relationship has been earned through attention to detail and high quality product. I wish to let you know that this project, which is on a very fast track, has been handled through design and submittal in a very professional manor. It is becoming rare to field a supplier who has the talent to bring a project like this to completion. Pat is a valued asset to Lectrus (Metal Systems) and has been a pleasure to work with.”
Mike Barefield
Construction Technologies, Inc.
International Division of Shealy Electrical Wholesalers